two question on General Principles of Discrete Event Simulation 2023 Business Finance

2023 I want sombody to solve question 2 and 3 only 2 An elevator in a manufacturing plant carries exactly 400

 

I want sombody to solve question 2 and 3 only.

 

 

2- An elevator in a manufacturing plant carries exactly 400 kilograms of material. There are three kinds of material packaged in boxes that arrive for a ride on the elevator. These materials and their distributions of time between arrivals are as follows:

 

 

Table 

 

It takes the elevator 1 minute to go up to the second floor, 2 minutes to unload, and 1 minute to return to the first floor. The elevator does not leave the first floor unless it has a full load. Simulate 1 hour of operation of the system. What is the average transit time for a box of material A (time from its arrival until it is unloaded)? What is the average waiting time for a box of material B? How many boxes of material C made the trip in 1 hour? 

 

 

 

 

3- Consider a single-product (s, S) inventory system, where the inventory level is checked at the beginning of every week. An order up to level S is placed if the inventory level I is less than s, while no order is placed if I is greater than or equal to s. Demand occurs with inter-demand time following a discrete uniform distribution with probabilities given by p(b) = 1/3 with b = 2, 3, 4 days. Demand size = 5, 6, 7, 8 with respective probability 1/6, 2/6, 2/6, 1/6. If the current policy parameters s, and S equals 10, 40 respectively and the delivery lag (lead time) is fixed at 3 days, calculate the total inventory cost of 4 weeks given the following cost information;

Ordering cost is $32+ $3 × Q, where Q is the order size. Holding cost is $0.1 per item per day.
Shortage cost is $1 per item per day
Note that at time 0, there is 40 items on hand. 

We give our students 100% satisfaction for their assignment, which is one of the most important reasons students prefer us from other helpers. Our professional group and planners have more than ten years of rich experience. The only reason that our inception days, we have helped more than 100000 students with their assignments successfully. Our expert’s group have more than 2200 professionals of different topics, and that not all; we get more than 300 jobs every day more than 90% of the assignment get the conversion for payment.

Place Order Now