14.The times required to complete each of eight jobs in a two-machine flow shop are shown in the table that follows. Each job must follow the same sequence, beginning with machine A and moving to machine B.TIME (hours)JobMachine AMachine Ba165b313c96d87e214f124g1814h2011a.Determine a sequence that will minimize makespan time.The sequence is .b.Find machine B’s idle time.Idle time[removed] hrsc.For the sequence determined in part a, how much would machine B’s idle time be reduced by splitting the last two jobs in half?New idle time [removed] hrs, savings of [removed] hrs.